Free songs

Bobbie Dalton

Bobbie Dalton
BOBBIE DALTON
Wurtland, KY 41144

EXPERIENCED : AUDITOR / SUPERVISOR LOOKING FOR A CHALLENGING POSITION IN THE WIRELESS TECHNOLOGY FIELD.

PROFESSIONAL EXPERIENCE:

Nortel
Tester
Install OTR’s in OM5200 and OME6500, CPL shelves, Run Fibers.
8/07

Clear Wire
Installation Technician
Mount , Program , Power-up and up-grade Foundry , Valere , Omnitronix SL81 , BTS ,Tasman , Digi Modem along with programming and commissioning of Redline , Orthogon and , Dragon Wave Microwave Installation and set-up.
5/07

Scom
AUDITOR
Pre install site audits , Post install site audits, troubleshooting for E-911 LMU ,
Decom “harvest” WLS , KDI, Program Kentrox and Flexmaster . Surveys , Beacon issues , Spect. issues , Holdovers , Gains , along with other maint. that goes along with LMU installs or HOT CUTS.
08/06 TO 12/06

Scom
INSTALLATION TECHNICIAN
Install LMU , Run RF , Sweep with Anritsu , Connectors ,Troubleshoot , Loopback test ,
Surveys etc… , 06/06 TO 8/06

Glotel 02/06 TO 04/06
INSTALLATION TECHNICIAN
LMU INSTALL,TROUBLESHOOT,MAINTENANCE, DRIVE TEST , T1 ISSUES WITH THE SWITCH , & COMMISSION THE EQUIPMENT

WILKINS 09/05 TO 11/05
LMU INSTALL,TROUBLESHOOT,MAINTENANCE, &COMMISSION IN BATON ROUGE & NEW ORLEANS POST KATRINA (ALSO HAVE PICTS. OF THE QUALITY OF MY WORK)

I.T.C. 03/05 TO 09/05
INSTALLATION TECHNICIAN – LEVEL IV

• WORKED PRIMARILY WITH SIEMENS HCBSC & HCTRAU
• COMPLETE INSTALL RUNNING CABLE TO DSX TERMANATE RUN & TERMINATE POWER BASE & EXTENSION RACKS IN CELL SITES

T-MOBILE – (Contractor) 10/04 TO 03/05
INSTALLATION TECHNICIAN

• INSTALL & COMMISION TRUE POSITION LMU
• PERFORM SITE SURVEYS
• TEST T-1 & POWER LINES USING T-BERD AND WATT METERS
• MEASURE AND WIRE SITES BASED ON TECHNICAL SPECS
• TEST AND TROUBLESHOOT ALL EQUIPMENT WITH REMOTE SWITCH TECH

BUTLER 08/04 TO 10/04
INSTALLATION TECHNICIAN
• INSTALL FUJITSU 4500 FOR BROADBAND RUN &TERMANATE POWER & DS3 ALSO QUALITY STANDARDS CLASS FOR FUJITSU

TAD 10/98 TO 08/02
INSTALLATION TECHNICIAN

• INSTALL NORTEL OC 192 OC 48 OC 12 OC 3 OPTERA & TRANSPORT BANDWIDTH MANAGER FIBER OPTIC CROSS CONNECT PANELS
• INSTALL LIGHTWAVE DISTRIBUTION FRAMES ALCATEL 600 S
• RUN & TERMANATE POWER BNC’S TIMING GROUND

EDUCATION : YEARS : MAJOR :

SHAWNEE STATE UNIVERSITY 2 EDUCATION

BASIC TELECOMMUNICATIONS COURSE “METHOD OF PROCEDURES” O.S.H.A. GUDELINESFOR WORK PLACE SAFETY , OWENSBORO, KY (1993)

FUJITSU STANDARDS AND INSTALLATIONS CLASS FOR TRANSMISSION EQUIPMENT , B.N.C. COAXIALCONNECTION AND INSTALLATION COURSE ; WASHINGTON, DC. (1996)

BELL ATLANTIC “STANDARDS , PROCEDURES , AND SAFETY ; BALTIMORE , MD. (1998)

MCI WORLDCOM COAXIAL CONNECTION AND INSTALLATION COURSE ; BOSTON , MASS. (1998)

TAD TELECOM “BASIC INSTRUCTIONALCOURSEFOR NEW LIGHTWAVE INSTALLERS” NEWPORT, RI. (1999)

MCI WORLDCOM “ DC POWER STANDARDS AND PROCEDURES” WILMINGTON, DE. (1999)

MCI WORLDCOM “ LIGHTWAVE FIBER SPLICING COURSE “ HARTFORD, CT. (2000)

MCI WORLDCOM “DC POWER STANDARDS AND PROCEDURES “ ( PHASE II ) CLEVELAND, OH. (2001)

True Position LMU Install training for single band 850 , Washington , DC . (2002)

T-Mobile LMU Installation and Maint. 850 New Orleans , LA . (2005)

True Position LMU Installation , Maintenance , Troubleshooting , Harvesting WLS , and KDI , San Francisco , CA (2006)

Clear Wire Install and provisioning training for Wireless Broadband Network Dayton , Ohio ( 2007 )