Free songs

Patrick C.R. Schreiber

Patrick C.R. Schreiber
Pat Schreir
P.O. Box 450100
Grove, Oklahoma 74345

OBJECTIVE
Seeking a position utilizing installation skills, with possible opportunities for advancement and stability within a company which allows me to maintain my high levels of efficiency while be able to take pride in my work.

TECHNICAL SKILLS

• Auxiliary Ironwork, General Framework Assembly
• Cabling and Wiring
• Circuit Switching Systems
• Connector making (am phenol, BNC)
• Bonding and Grounding
• Installation, Tune-up and Test, C.O. Equipment
• WSI Boilermaker Welding Skills
• Equipment Removals
• General Installation Practices
• Telecommunications Network Operations
• Job Specifications and Drawings
• Power Arena
• Fuse and Breaker Panels
• T1 Expansions for UMTS
• Inventory Pictures
• Box mounts and Wall Mounts
• Site Integration Call Testing with GSM and TDMA Equipment
• Nokia Cross-connects
• Purcell Cabinets
• Carrier Access, Path Master, Kentrox, Flex Master, CSU Systems
• Troubleshooting T1, LMU, CSU
• DSX Wire Wrapping Procedures
• Installation, Commissioning, Maintenance of E911 Systems
• PDU Installations
• Diplexers Swap-out, Installations
• RF Bias T Installations
• D.A.S. Installations
• Coax and Fiber Runs
• Directional and Omni Antenna Mounts
• Scissor Lift Experience

CERTIFICATIONS
• Associate Degree Pre-Law Northeastern A&M College
• Central Office Inventory
• Safety Training

EMPLOYMENT HISTORY

Krystal Tech Services INC Lead Field Technician/Commissioner 2013-Present
Installation and integration of RBS 660l LTE racks which entailed powering, fibering, and integration of all equipment in racks, Also Trained all new tech coming into market.

Sitemaster LLC Lead Field Technician/Integrator 2012-2013
Certified in 2G, 3G PCS, 3G AWS, LTE, for T-mobile dealing with commissioning and Integration

Sitemaster LLC Technical Quality Control December 2011-2012
In charge of operations and quality control, which dealt with assessing and correcting pictures, forms, and sketches sent in from the field inspectors for whole cell site audits which included the power provider, to all equipment in the facility to, room for future expansions.

Glotel Lead Technician September2011-October
In charge of Training new Techs and installing 2” conduit for T-mobile on a SIAD project consisting of installing conduit from Demarc to 2G and FCOA cab. Pulling cat-6 cables through installed conduit.

Cortel Field Supervisor November 2010- Sept.2011
Perform installations of Alcatel, Tellabs, and Cisco Routers for At&t, which enabled remote access and control of whole cell site. Maintain communication with support at PCO make sure equipment is operational. Run scripts for Electrical, Optical and LTE purposes. Install Fiber and Cat-5 to Equipment. Install ETMFX-11 cards and Scripts for UMTS technology.
In charge of Training and Supervising techs new to Los Angeles, Arizona markets

Patrick C.R. Schreiber
P.O. Box 450100
Grove, Oklahoma 74345
918-325-0729
pat_schreiber@hotmail.com

EMPLOYMENT HISTORY CONTINUED

Glotel Consultant April 2010-October-2010
Perform surveys of LTE Expansions for AT&T 4G equipment, entailing taking measurements, pictures and sketches of cell sites, compounds and antennas. Obtaining and completing of feed documentation for future installations.

True Position Lead Field Technician February 2010 – April 2010
Deployed to Spain for survey and installations of E911 equipment.

AIM Technical Consultants Lead Field Technician July 2009- February 2010
Installation and programming of Tellabs 8605 Access Switch. Deployed to Alaska twice for Installation, programming, and commissioning of LMU.

Jones Construction Carpenter January 2009 – July 2009
Remodel buildings for customer.

R&R Solutions Technician June 2008- October 2008
Installed Tech PC’s and Backup PC’s for the customer, ran Cat 5 cable, terminate in communications room and junction box, made sure software runs correctly for customer.

Thompson Technology Group Inc. Field Technician April 2008 – July 2008
Installed T1 expansion for AT&T UMTS project. Punch down Telco, mount surge arrestor, run cat-5 cable, wire wrap on DSX panel, call test with Net Analyst. Worked with streets and trip, excel data forms, and sent in T1 test report form to project manager.

Gazelle Technical Services Field Technician October 2007 – March 2008
Perform central office inventory procedures, which included taking pictures of RT. Customer premises and C.O. equipment. Organizing pictures into inventory software, taking Latitudes and longitudes of location.

Total Wireless Communication Services Field Technician June 2006 – December 2007
Perform full cell site installations, from the Power bays, BBU’s, LMU, CSU, cabinets.

Goodman Networks Lead Field Technician January 2005 – June 2006
Complete installation for the E911 project which includes installing LMU on Ericsson 2106, 2102 Lucent and Nokia cabinets, installed DSU, Fuse panels, GPS antenna, ran power and powered up, T-1 grooming and test with T-bird 107A. Download appropriate software to the LMU and DSU. Commissioned LMU and DSU with MTSO and complete E911 call testing.

Welding Services Inc. Welders Helper May 2004 – August 2004
Helped welders by fire watching, getting appropriate tools when needed, cleaned bolts, lowered and pulled men out of the vessel safely, recorded time logs, wound up cables, kept job area clean and safe to work and kept a clear line of communication outside of vessel. Completed first aid and safety courses

D&D Welding & Fabricating Welder October 2003 – May 2004
Measured, cut, welded, fabricated, steel for docks and walkways, Transport finished product by water or land, drove tugboat and boom truck.

REFERENCES
Cody Lawless 918-860-0060
Brian Grant: 817-713-3565
Johnny Tran: 714-454-4573
Dan Burdeshaw: 850-209-0870